Project

Bicycle footbridges over the Poprad river

Description:

Description:

Production and assembly of the steel structure of two bicycle bridges connecting the Polish-Slovak borderland as part of the “EuroVelo 11-Prešov-Muszyna-Mniszek on the Poprad” project.
Technical data:

  • arch footbridge with a downward ride in Milik with a theoretical span of 58.3 m, total length of 69.3 m
  • arch footbridge with a downward ride in Andrzejówka with a theoretical span of 80.3 m, total length of 90.1 m
  • Material: S355J2, S355JRH steel
  • Weight of both structures: 62.2 Mg + 91.3 Mg

Date:

Date:

20200106
20200908